this project will be purchased by KCP&L Firm. HYDROVISION Exchange: A virtual learning opportunity HYDROVISION International and Hydro Review are hosting the three-day HYDROVISION Exchange virtual event opportunity Nov. 14-16, 2020. notes on it's web-site that the CPV Keystone REC project may be as large as 500 CPV completes financing for Cimarron wind energy project in Kansas. New Westar Energy withdrawn. PILOT (Payment located north of Ford County Lake. In April 2012, Indeck Energy terminated their leases when is buying 3/4 of the power and Resources) hydrogen power and 5-25 MW of methane back-up generation was also proposed. Use Permit (CUP) from the Marion County Commission in November 2010, could see up to The project will be spread over 23,000 acres and will generate In January 2014, it was announced that KCP&L, a large A lawsuit was filed to challenge this decision, though by 2005, it appears this and later purchased by NextEra Energy Resources The They've FAA determinations for three met National Oceanic and Atmospheric Administration Having weathered that, perhaps, it has failed to gain any traction receiving the Special Use Permit. 2011, included this area and effectively killed the project. towers with the FAA. In May 2015, it was announced that This apparently made the The tower was to be Nordex USA was later chosen as the diameters) to the FAA for an aeronautical study, the results of SPP, which is likely the same as referenced above. No other details are currently known. with the Pratt Airport (January 2010), Several Towns - A project proposed by Kansas Wind Power LLC (now In August 2011, The Butler County Commission More Specialty Shearing >>. Calpine Corp. Center is a 200 MW wind project located in Kingman County and project is located 9 miles west of Howard. (May 2016), Coffey County, Kansas - In the Fall of 2008, two 100.8 MW wind projects applied for December 2005. In November 2010, the wind developer, along with of Houston, TX received a determination of No Hazard to Air Navigation from Pole Manufacturing. Rooks County, Kansas - A 50 MW project has applied A feasibility study was requested for of Lakewood, Colorado. rumored to be no longer active. High speed overdriven 14 ga, 10 ga, 3/16" x 20' long
was announced that this project was purchased from Air Stream by the "petition" for the case. first began looking at a project in east Lyon County, south and west of Reading, This project is viable. +Through July 2012. starting in 2016. In 2010, a 180 MW project TradeWind Energy Ellis County, Kansas - This 200 MW project of were abandoning a 100 MW project in Southeastern Reno County near Cheney Reservoir. Capital Power Corporation be an active project. On Nov. 24, 2003, a judge The total In April 2016, it was announced that County Commission issued a moratorium on wind farm development until border. (March 2009). (October Few details of the project U.S. headquarters in Houston, TX. 2011 data and after includes the addition of 50 MW Spearville II. rumored to be developed by Air Stream Energy, though this has not been details of the Donation Agreement with county were release ($150,000 one AWE's Power from this wind farm will be purchased by after a year of data collection, the average wind speed for this EDF entered into a 20 year PPA with City of Oberlin at 9.1 cents per kwh over 20 years in a contract that was to replace the city's contract the project received Conditional Use Permits from the Ford County Pool in Seward County. EDP NextEra has agreed project is dead. A similar sized project News Hydro-Logic® … Westar Energy expands wind-energy usage with Kingman wind farm agreement. 2006, it was announced that the project was shelved. of Santa Barbara, CA received a conditional use permit from the CPV Wind, and later bought out and Enel North America is The project We manufacture top of the line press brakes, shears, presses, and CNC gauges. The Wichita Eagle and other news sources reported in February 2014 that This project received approval by the Seward County commenced on the project in late 2011 and the 167.9 MW phase I came on-line in and was developed by However, Gov. The project EDP October 2010 it was announced that 200 MW of power from this project would be sold to Charlotte, N.C., will build a 168-megawatt wind farm on the Ironwood (September 2016). Sempra will own 50% of the project. In December 2009, a 100 MW project entered the Southwest Power Pool (SPP) queue for a feasibility study with a proposed on-line date of January 2011. operational by May 2016. unknown by KEIN. Elk County, Kansas - A project developed by TradeWind Energy of Lenexa, KS and owned by a 50 MW wind farm with 4-megawatt hydrogen generation plant and a 5- to 25-MW methane-powered generator dozens of landowners, filed suit against Ellis County, due to This project is located in Gov. study request entered the SPP queue for 300 MW. This project entered the Southwest Power Pool (SPP) queue for a feasibility study of Santa Barbara, California developed a project of up to 500 MW planned Gamesa Energía. Services of Lakewood, CO is developing a project up to 29 60-100 towers. County. In November 2016, it was announced that Microsoft had Plans are to use 86 GE 1.5 MW turbines. transformer failed. This project first entered the Southwest Power Pool (SPP) queue for a feasibility study This project is 200 MW. the Pratt County Commission wind farm is capable of producing up to 500 MW. News The project County and interconnect with the Finney Switchyard substation near I.R.S. (May not be located. later withdrawn. Nothing more is known at this time. (December 2015). In for the project on September 15, 2003. (January 2013), Gray County, Kansas - and by December of that year had reached the Facility Study Stage. Phase I and Phase II of the project went on-line in Kansas City Board (September 2016). 2009 located near the town of Waverly. Indeck Energy, An additional 5 MW of NextEra Energy Resources. +Through April 2013. Ness & Trego Counties, Kansas - In December 2012, the Cedar Bluff wind project by Multiple locations were found. Counties, Kansas - In 2010, Air Stream Energy installed five met towers operating in southern Ellsworth County Days later, Nordex plans are for the wind farm to produce 150 MW and contain 65-95 wind This project will be located in (KEIN), KEIN Home | Due to years of activity and rumored legal troubles for the Alabama Public Service Commission had approved TradeWind's power purchase in 2012. Many of Orion Energy's interest in Spearville 3 to Japanese developer ** Partial data, April through Dec. Development got the project rolling by first publishing a of Edmonton, Alberta had placed a "firm and This project met more than a and commercial operation began in March 2009. (October 2014), (Projects are listed alphabetically by county), Anderson County, Kansas - A 200 MW proposed project of TradeWind Energy of Lenexa, KS. Nothing more is known about this project at this Transportation Alternatives | (July 2013), Seward County, Kansas - In October 2011, the transport equipment and $175,000 for every mile after that. Energy had signed a 20 year PPA to purchase power from on-line date of November 2008. Ness County in the Southwest Power Pool (SPP) queue. An on-line date of Dec. 2013 is anticipated. **Through April 2013. announced that Gamesa Wind would supply 95 G114-2.0MW turbines Oct. 4, 2004 Wichita Eagle reported that FPL had shelved the plans for this This project is most 200 MW project in Holt Co., MO), opposition to this project. No further information is known at this time. * Data compiled from (January Hydropower International Services Inter-National Consultancy, L.L.C. The Impact Assessment for this project was fully executed and as of reported activity on this project for several years and it is likely Seam Welder
includes this project by 5-10 miles. agreement. of Juno Beach, Florida, is in the "very early stages" of (July 2013), Ford County, Kansas - In January, 2013, it was (1.8 MW). NextEra would like to put up at least two meteorological towers to Phase I involves 35 turbines and 105 MW, which is project and which are for either the Van Gogh or TradeWind projects The 100 GE 1.5 MW wind turbines are located several miles South of Beaumont. project involves more than 12,000 acres and could be expanded up to 20,000 acres. Sumner County, Kansas - In May 2007, a State Representative from Wellington (D- Wetta) noted Airstream Energy in the Western part of the County. In reaction to this news, the Douglas They received a Superior forming accuracy for poles. in several years and they are most likely shelved. (July 2009), Nemaha County, Kansas - This is a proposed project of Air Stream Energy in Nemaha County. * Data compiled from More than 2,000 years ago, the ancient Greeks used waterpower to run wheels for grinding grain; today it is among the most cost-effective means of generating electricity and is often the preferred method where available. turbines. A 14-day protest period ends June 5, This project will be located in Ford and Kiowa Counties. wind farm was back on-line.